Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Aug 05, 2021     Engine mount bolts, hinge pin tubing, cabin heat scat tube and breather tube - (3 hours)       Category: Engine
Received new stainless tubing to replace cowling side hinge pin aluminum lead in tubing that deformed when I tried to open it up. Bent to shape and installed. Need to figure out how to properly secure it and cut to final length. Sam retorqued firewall to engine mount bolts and secured with cotter pins. Began fitting cabin heat scat tube from inlet duct to heat muff. Removed inlet ducts to prep for paint and determine location of scat tube cutout. Started bending of new breather tube since old one interfered with oil cooler on firewall. Photo of tools used to connect two Adel clamps together to secure breather tube to engine mount.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.